The solution refers to a complex of 587 apartments, 43 individual homes and over 2,000 square meters of commercial space, for which innovative systems of building automation were developed and installed to the highest standards of comfort and safety.
Discover the projectAt the request of HEFI, the company contracted to install the curved glass panels for the first floor of the Eiffel Tower, CAME installed the automatic doors for the Ferrié Pavilion. In view of the need to comply with the constraints of the site and, in particular, having to build the entrance into a sloping...
Discover the projectThe “Came Domotic 3.0” building-automation system in the Church of St Lucia makes clever use of the natural light of the church, while heightening and optimizing its special chromatic qualities. The use of LED technology has not just cut electricity consumption, but the absence of ultraviolet and infrared...
Discover the projectThe project entailed the installation of 300 Domino LED lighting fixtures in areas dedicated to the sale of fresh food and wines, at a point used for in-store promotions, at the top of exhibition aisles, and in several other spaces of general use. In an improvement on the previous system, the new lighting solution...
Discover the projectThe BPT video door entry system at The Lancasters is made up of 23 bespoke DIGITHA entry panels connected to a secure communal the LAN network by means of 6 ETI/XIP network interfaces. The network server ETI/SER oversees and manages the correct routing of all audio/video communications between the entry panels and...
Discover the projectThe contract here was to install a system of flow control for the cruise-ship passengers who make use of the Barrakka Lift every day to reach the centre of La Valletta. The lift, inaugurated in December 2012, offers a practical alternative for the thousands of tourists who disembark daily at the port of La Valletta...
Discover the project